The existing PVC membrane in the Delta Lagoon called for a replacement owing to age and mechanical damage.
To address water losses through the compromised membrane, the replacement was required to reduce the pumping required to maintain water level.RJC was retained to provide Prime Consulting and Design services to replace the existing membrane and a phased approach was developed.
The first phase, membrane replacement in the Rhapsody Fountain area was undertaken and successfully delivered in collaboration with the contractor.