The Elevated Departures Level roadway structure was extended almost 200m to accommodate a major expansion of the adjacent seven level parking structure, with interconnecting vehicle and pedestrian bridge links.
This extension is designed to carry CL625 highway loading and was designed to accommodate future expansion of the airport terminal building and parkade.